Careful Quality Inspector with extensive knowledge of inspections and commitment to high-quality work. Known for great work ethic, consistent performance and great efficiency. Detail-oriented Quality Control Inspector with more then 10 years years of experience working closely with QA/QC department. Expert in NDT and Welding process inspections. Known for meticulous organization and attention to product minutiae.
Welding process /staff qualification and welding performance, post welding - Inspections and final acceptance tests during production of pipes (NDT) - Supervision during welding process - Cooperation with client - Permanent supervision at a sub-supplier workshop
Worked with specific production team members to rectify production issues and maintain high-quality final products.
Developed checklists to coordinate inspections with departmental managers.
Supervised production workers to identify areas in need of improvement for high-quality production.
Contract was signed for BALTIC EAGLE project as Quality control inspector
Ensure all welding is according the approved procedures.
Fit up inspection before welding
100% Visual inspection after welding.
Witnessing the quenching and liaise NDT department to perform the required tests for that project.
Monitored performance and generated reports detailing quality of product and defect rates.
Documented findings and generated reports with data and recommendations.
Proposed and implemented improvements to reduce errors and rejected items
Scope of inspection: VT, MT, PT, UT-PA,
UT- PA - Complete inspection (pipe lines, tanks, constructions)
VT, MT/MPI, Quality control of welds and materials
Thorough inspection establishing protocols.
NDT test results interpretation
Location: Germany
Project: Bayernoil ( shutdown )
Supervision during welding process
Cooperation with client
Permanent supervision at a sub-supplier workshop
Reports to the quality management department
VT, MT, PT, UT-PA
Ultrasonic inspections and Supervision :
on tracks and rails welds, flanges, castings, construction welds.
Testing of new incoming welders
Magnetics and visulal inspections on 100% of that all
NDT devices and instrumentation calibrations, processes performance and
in process calibrations,
NDT test results interpretation, visual and dimensional check, traceability
welding process /staff qualification and welding performance, post welding
Inspections and final acceptance tests during production of pipes
Location: Germany
Project: Mack Ride Gmbh – Waldkirch, Emmendingen, Herbolzheim
Evropapark – Rust
Holidaypark – Hassloch
Erlebnispark – Tripsdrill
Location: HEEREMA Fabrications group – Zwijndrecht
Project: STATOIL
Location: HEEREMA Fabrications group – Vlissingen
Project: MAERSK
UT - Complete inspection (pipe lines, tanks, constructions)
VT, MT/MPI, PT/DPI, PMI Quality control of welds and materials
Thorough inspection establishing protocols.
NDT test results interpretation.
Since: Responsible for quality inspections on industrial products in branches of
Metallurgy, mechanical engineering, welded products and chemical products.
Supervision for customers - NDT test results interpretation, Visual Dimensions I Inspection of welding process / staff qualification and welding performance.
Witnesses at the pressure test
Inspections and supervision during production of pipes and fittings at this project.
Supervision during welding process according generals procedures and WPS
Cooperation with client ( General Electric ) and notified body
Permanent supervision at a sub-supplier workshop ( 2JCP a.s. )
Reports to the quality management department
Location: Racice, Czech Republic
Pojects: The Ychthis LNG / GHANA – GE
Calciner / BASS
Project: GUNVOR PETROLEUM ANTWERP – refinery
/ shutdown/
Location: Antwerp, Belgium
RT Complete inspection (pipe lines, tanks)
UT, VT, MT/ MPI /, PT/ DPI /
PMI - testing
Thorough inspection establishing protocols.
NDT test results interpretation
Since:
Responsible for quality inspections on industrial products in branches of
Metallurgy, mechanical engineering, welded products and chemical products.
Supervision for customers - NDT test results interpretation, Visual Dimensions I Inspection of welding process / staff qualification and welding performance.
Witnesses at the pressure test
Inspections and supervision during production of pipes and fittings at this project.
Supervision during welding process according generals procedures and WPS
Cooperation with client ( General Electric ) and notified body
Permanent supervision at a sub-supplier workshop ( 2JCP a.s. )
Reports to the quality management department
Pojects: The Ychthis LNG / GHANA – GE
Calciner / BASS
Scope of inspection:
Ultrasonic inspections and Supervision on-pipelines, flanges, castings, construction welds.
Magnetics inspections on constructions plates,
NDT staff qualifications, NDT devices
and instrumentation calibrations, processes performance and procedures,
in process calibrations, NDT test results interpretation, visual and dimensional
check, traceability check, heat treatment performance check,
welding process /staff qualification and welding performance, post welding
(XRAY) performance and qualifications, condition check, pressure test.
Inspections and supervision during production of pipes and fittings at this project.
Supervision during welding process according generals procedures and WPS
Cooperation with client and notified body
Permanent supervision at workshop
Reports to the quality management department
Location – Nederland, Heusden
Project - Pioneering Spirit / Oil & Gas Vessel,
Talisman - Energy Platform / Oil & Gas,
Scope of inspection :
Witness, Inspection & Monitoring of production and testing in accordance
with project approved ITP and relevant standards & specifications.
Supervision for customers - NDT test results interpretation, Visual Dimensions Balancing, Run out and Painting checking. Inspection of welding process / staff qualification and welding performance
Location : Austria, Germany, Sweden, Spain, Romania, Czech Republic
Project: Voith Hydro - Saratov,
Voith Hydro – Akkatz
Fundyser – Braskereidfoss,
Richter Maschinenfabri AG – Upper Kalekoy
PSP Prerov – Baglihar
ANSALDO – Anello tenuta
Scope of inspection:
Witness, Inspection & Monitoring of production and testing in accordance
with project approved ITP and relevant standards & specifications.
Supervision for customers - NDT test results interpretation, Visual Dimensions Balancing, Run out and Painting checking. Inspection of welding process / staff qualification and welding performance.
Location - Austria, Germany, Italy, Sweden, Norway.
Bosnia and Herzegovina, lovenia.Switzerland.
Project – Voith Hydro – St. Poelten, Austria
Alstom Power – Linthal KW Limmern
GE Oil and Gas - Cassa BCL
Voith Hydro – Saratov
Siemens AG – diaphragm CPL
INTERNATIONAL WELDING INSPECTOR / IWI-S ( in progress )
NDT Level 3 - RT, UT ( EN ISO 9712 )
NDT Level 2 - UT/PA, VT, MT, PT (EN ISO 9712)
Befähigte Person für Druckbehälter und Rohrleitungen nach TRBS 1203
HSE-Examination for operational supervisors - SSC 017 / SGU-Personal-VAZ 2021